Application to the National Energy Board

Canadian Arctic Gas Pipeline Limited. by Canadian Arctic Gas Pipeline Limited.

Publisher: Canadian Arctic Gas Pipeline in Toronto, Ont

Written in English
Published: Pages: 19 Downloads: 20
Share This

Subjects:

  • Natural gas -- Mackenzie Valley -- Northwest Territories -- Pipe lines.,
  • Natural gas -- Yukon Territory -- Pipe lines.

Edition Notes

ContributionsCanada. National Energy Board., Arctic Gas.
Classifications
LC ClassificationsTN"880.5"C33"1974"V.1
The Physical Object
Pagination19 leaves :
Number of Pages19
ID Numbers
Open LibraryOL21011796M

NATIONAL ENERGY BOARD IN THE MATTER OF the National Energy Board Act, RSC , c N‐7 ("NEB Act"), as amended; AND IN THE MATTER OF an application by Aurora Liquefied Natural Gas Ltd. for a licence pursuant to section of the NEB Act authorizing the export of liquefied natural gas. on an application. A time limit of three months was imposed on the Governor in Council when responding to the recommendations from the NEB. The NEB Act was revised as below to support the successful implementation of these time frames:5 1. The Board may have an unlimited number of temporary board members – compared to a. VANCOUVER - Kinder Morgan Canada filed its long-anticipated application to the National Energy Board on Monday to nearly triple the flow of oil through its Trans Mountain pipeline from Edmonton to the British Columbia coast. The $billion project could result in a seven-fold increase in tanker traffic in the waters that surround Vancouver. National Energy Board. Riparian Habitat Management Plan. Trans Mountain must file with the NEB for approval, at least 3 months prior to strategies (reclamation method, reclamation measures, and application criteria) for the range of defined watercourses crossed by the Project; c) a description of the generalized vegetation.

Application. I applied through college or university. The process took 6 weeks. I interviewed at National Energy Board in March Interview. Was asked to perform a written assignment and had to write an essay on Canadian energy markets. NOVA Gas Transmission Ltd. (NGTL) has submitted an application to the Canada Energy Regulator (CER), which replaced the National Energy Board (NEB) in August , to construct the NGTL System Expansion Project (the Project). The CER is currently assessing the completeness of the Application. TORONTO - More than 60 organizations are calling on the National Energy Board to suspend TransCanada's application for the Energy East Pipeline. Groups including Greenpeace Canada, the Council of Canadians and the David Suzuki Foundation said in a letter to the federal pipeline regulator that it should suspend the review process while waiting. A cooperative venture between the Southern States Energy Board and the Kentucky Department of Energy Development and Independence of the Energy and Environment Cabinet, this report serves as a foundation for the discussion of energy programs, policies, and technologies that can enhance economic development and the quality of life in the region.

The National Energy Board said pre-application meetings are one of the options it offers to give more information on the application process, and that it doesn't yet know the timeline for the project. 84 For Conditi and , an” independent certification body” is an internationally recognized company or organization, such as Lloyd’s Register. The projected number of jobs in New Brunswick during development and construction has increasted from 1, to 1,, according to the company's application to the National Energy Board. Technical Report: Reasons for decision in the matter of BC Gas Utility Ltd., application dated 14 July for orders under Sections 70 and 71 of the National Energy Board Act requiring Westcoast Energy Inc. to receive, transport and deliver gas from Kingsvale to Huntingdon, British Columbia, and prescribing terms and conditions, including tolls, for the service: RH

Application to the National Energy Board by Canadian Arctic Gas Pipeline Limited. Download PDF EPUB FB2

Document Type: Book: All Authors / Contributors: Canadian Arctic Gas Pipeline Limited.; al Energy Board. OCLC Number: Notes: Cover title. In some cases, that permission must come from the National Energy Board (NEB or the Board). Before a decision is made on an application for a major pipeline or power line project, the Board will hold a.

NATIONAL ENERGY BOARD. IN THE MATTER OF the National Energy Board Act, RSCc N-7, as may be amended from time to time, and the Regulations made thereunder; AND IN THE MATTER OF an application by the Haisla Nation for a license pursuant to Section of the National Energy Board Act authorizing the export of natural gas.

The National Energy Board (NEB or the Board) is committed to ensuring that our prospective applicants are provided with opportunities to fully understand the Board’s processes. Pre- application meetings between prospective applicants and Board staff are one of the options.

NATIONAL ENERGY BOARD OFFICE NATIONAL DE L’ÉNERGIE Hearing Order OH Ordonnance d’audience OH Enbridge Pipelines Inc. Line 9B Reversal and Line 9 Capacity Expansion Project Application under s of the National Energy Board Act Pipelines Enbridge Inc. Projet d’inversion de la canalisation 9B etFile Size: 1MB.

("ISH") filed an application pursuant to section 52 of the National Energy Board Act (the "Act"), for a Certificate of Public Convenience and Necessity to construct a crude oil pipeline, along with associated facilities, from ISH's existing Desan field battery in.

The Board determines if information in application is sufficient to proceed Information requirements for the application are in the Board’s Filing Manual Consultation Program (Chapter 3). A pipeline, the operation of which has been abandoned with leave of the Board as required by paragraph 74(1)(d) of the National Energy Board Act, and that remains in place.

(Pipeline dont l’exploitation a cessé) Aboriginal. Includes the Indian, Inuit and Métis peoples of Canada. National Energy Board approves NGTL’s Plan, Profile and Book of Reference. Once a company has received a Certificate of Public Convenience and Necessity to build a pipeline, one of the first steps is to file a Plan, Profile, and Book of Reference (PPBoR) with the NEB.

The National Energy Board was an independent economic regulatory agency created in by the Government of Canada to oversee "international and inter-provincial aspects of the oil, gas and electric utility industries". Its head office was located in Calgary, Alberta.

The NEB mainly regulated the construction and operation of oil and natural gas pipelines crossing provincial or international borders. The Minister of Natural Resources has established an Expert Panel to conduct a targeted review of the National Energy Board's (NEB) structure, role and mandate under the National Energy Board Act.

This is a key element of the Government of Canada's review of environmental and regulatory processes. NATIONAL ENERGY BOARD IN THE MATTER OF the National Energy Board Act, RSC,c. N-7, as amended, and the Regulations made thereunder; AND IN THE MATTER OF an Application by Triton LNG Limited Partnership for a licence pursuant to section of the National Energy Board Act authorizing the export of liquefied natural gas.

To: Secretary. National Energy Board Rules of Practice and Procedure, 1 - Short Title; 2 - Interpretation; 3 - PART I - General. 3 - Application of This Part; 4 - Dispensing with or Varying Rules; 5 - Computation of Time; 8 - Service; 9 - Filing of Documents; 10 - Amending of Documents; 11 - Affidavits; 13 - Questions of Law; 14 - Contents and Form of Application.

IN THE MATTER OF National Energy Board Actthe, RSCc N-7, as amended; AND IN THE MATTER OF an application by GNL Québec Inc. for a licence pursuant to section of the National Energy Board Act authorizing the export of gas.

To: Secretary of the Board. National Energy Board. Tenth Avenue SW. Calgary, AB. T2R 0A8. APPLICATION.

32 (1) On an application for a certificate, the company shall file with the Board a map in such detail as the Board may require showing the general location of the proposed line and such plans, specifications and information as the Board may require.

NATIONAL ENERGY BOARD NORTH AMERICAN ELECTRIC) RELIABILITY COUNCIL) and) NORTH AMERICAN ELECTRIC) RELIABILITY CORPORATION) APPLICATION FOR RECOGNITION AS THE ELECTRIC RELIABILITY ORGANIZATION Richard P.

Sergel President and Chief Executive Officer David N. Cook Vice President and General Counsel. e-books and guides. Inform your decisions via doubt make him a valuable addition to the National Energy Board, but he was definitely appointed at the wrong time.

the decision on the Trans Author: Mark Hume. Modernizing the National Energy Board. For nearly 60 years, the National Energy Board (NEB) has been responsible for regulating approximat kilometres of international and interprovincial pipelines 1, kilometres of international power lines and imports and exports of energy in Canada.

The National Energy Board (NEB) is an independent tribunal with responsibilities under legislation such as the National Energy Board Act, the Canada Oil and Gas Operations Act (COGO Act) and the Northern Pipeline Act. Sincethe Board has been engaged in the delivery of its mandate in the regulation of pipelines, energy development and trade.

The Adobe Reader software is available for free on the Adobe website. Guidance for Completing the Drug Submission Application Form (applicable on or after. CER – Electricity – Export Applications.

National Energy Board; > Electricity – Export Applications. The National Energy Education Development Project promotes an energy conscious and educated society by creating effective networks of students, educators, business, government and community leaders to design and deliver objective, multi-sided energy education programs.

Every decision or order made by the National Energy Board is considered to have been made under the Canadian Energy Regulator Act and may be enforced as such. Every certificate, licence or permit issued by the National Energy Board is considered to have been issued under the Canadian Energy.

NATIONAL ENERGY BOARD. IN THE MATTER OF the National Energy Board Act, R.S.C.c. N-7, as amended, and the regulations made thereunder; AND IN THE MATTER OF an Application by Enbridge Pipelines Inc.

pursuant to Part IV of the National Energy Board Act for approval of a Competitive Toll Settlement in respect of tolls for the. The National Energy Board (Board) has received an application from NOVA Gas Transmission Ltd.

(NGTL) for approval to build and operate km of natural gas pipeline and associated facilities. The proposed West Path Delivery Project (Project) would be located within Rocky View County, the Town of Cochrane, Municipal.

Reviews from National Energy Board employees about National Energy Board culture, salaries, benefits, work-life balance, management, job security, and more/5(13).

PART I National Energy Board Establishment of the Board. Board established. 3 (1) There is hereby established a Board, to be called the National Energy Board, consisting of not more than nine members to be appointed by the Governor in Council.

Tenure of members (2) Subject to subsection (3), each member of the Board shall be appointed to hold office during good behaviour for a period of seven.

Guide to the National Energy Board Participant Funding Program under the National Energy Board Act. Calgary, Alta.: National Energy Board, © (OCoLC) Application for an LNG Export Licence to the National Energy Board.

GNL Québec Inc. (GNLQ) Export Impact Assessment (EIA) An assessment of the present natural gas market circumstances and the impact of exports as applied for by GNL Québec Inc.

upon Canadians to meet their future energy requirements over the requested licence Size: KB. The National Energy Board (Board) received an application from Energy East Pipeline Ltd. (EEPL) for approvals needed to construct and operate the proposed Energy East Project, a 4, km crude oil pipeline system from receipts points in Alberta and Saskatchewan to delivery.

On Septem the National Energy Board (NEB) did something remarkable. They stopped time. More precisely, they traveled back in time, to Septemstopped time, then traveled back to the future, to January 8, to start it again. In the words of the Time Lord, Dr. Who, time is indeed “wibbly wobbly timey wimey stuff?”.

NATIONAL ENERGY BOARD OFFICE NATIONAL DE L’ÉNERGIE Hearing Order RH Ordonnance d’audience RH TransCanada PipeLines Limited (TransCanada), NOVA Gas Transmission Ltd.

(NGTL) and Foothills Pipe Lines Ltd. (Foothills) Application dated 1 September for Approval of the Business andFile Size: 1MB.NATIONAL ENERGY POLICY (Presidential Regulation No. 5/ dated Janu ) WITH THE GRACE OF THE ALMIGHTY GOD To stipulate: THE PRESIDENT OF THE REPUBUC OF INDONESIA, PRESIDENTIAL REGULATION ON NATIONAL ENERGY POLICY.

Considering: a, that, to ensure sufficiency of domestic energy sup- ply and to support sustainable development, it is nec.Filing of the Business Plan and Budget for NERC and the Regional Entities (National Energy Board) 9/17/ Approval of Amendments to the NERC Bylaws (National Energy Board).